FAQs

Quality Creates Reliability

1220mm x 2440mm x 4mm, 1220mm x 2440mm x 3mm

Width:1220mm、1250mm、1350mm、1500mm、1570mm

Length:less than 6000mm

Alu. Thickness: 0.50 x 0.50mm,0.40 x 0.40mm

0.30 x 0.30mm, 0.21 x 0.21mm

0.15 x 0.15mm

What are the characteristics of ALUTILE Aluminum Composite Panel?

a) High peeling strength

b) Superior Weather Resistance

c) Light weight and easy to process

d) Coating evenness, varied colors

e) Easy to maintain

f) Impact resistance

How about the guarantee periods of PVDF coating and polyester coating respectively?

Generally speaking, for PVDF coating, the guarantee period of non-bright color is 20 years, bright color 15 years. For polyester coating, the guarantee period of non-bright color is 12 years, bright color 8 to 10 years.

Who are the suppliers for the raw materials?

The aluminum coils adopted high quality aluminum alloy 5005 or 3003 and purchased from the largest supplier in China.

PVDF coating resin: 70% PVDF resin, Kynar 500, Hylar 5000, American PPG, Sweden     BECKER.
c) The bond material (High-molecular film) adopted from American Dupont company.
d) Surface treatment adopted Germany Henkel film technology
e) Protective film imported from France Novacel Company and Germany Polifilm Company, ultraviolet resistant, avoid color fading during the installation.

What’s the package method?

In bulk or wooden case.

How many quantities can stuff into a 20’FCL and 40’FCL?

It depends on the specification of panels and the weight limit of shipping company. Take the standard size for example:

Standard size 1220x2440x4mm

If packing in bulk: 1060sheets(3155.41sqm)/1x20'FCL

1492sheets(4441.39sqm)/1x40’FCL

If forklift packing in wooden case:  720sheets (2143.30sqm)/1x20'FCL

1407sheets (4188.36sqm)/1x40’FCL

What’s the MOQ for ACP?

Minimum order quantity: 800sqm per color and per width.  If less than MOQ, We require extra USD600.

How will you surcharge for special color?

For special color or customer’s color, the price should surcharge USD600.  Customer should accept the balance quantity 3%.

What’s your payment term?

Normally , 30% amount by T/T in advance, 70% amount by T/T before the shipment.

Or 30% amount by T/T in advance, 70% amount by L/C at sight.

Will you supply the accessories and processing equipment?

Available. We don’t manufacture the installation accessories and processing equipments, but we can purchase it from other companies.